'As a family business, we believe in creating long-term relationships.'

Click here for your quotation
Co van 't Hek
Board Chairman

'Execution of your project in accordance with your developed plans is what we do! Acting proactively, innovative, and strong through collaboration'.

 

View our projects here
Bart van 't Hek
Managing Director

our expertise

expertise Consultancy
more information
expertise Consultancy
Designing and executing creative solutions, saves time and costs gives us great satisfaction.
expertise Monitoring and control
more information
Proper monitoring prevents the construction process from coming to an unnecessary standstill.
expertise Training and education
more information
We are pleased to share specific knowledge, and years of experience, with you and your employees.

our highlighted projects

see all projects TBL piling MOF Phase 1 Project

Afungi, Mozambique

Project in collaboration with Alphahek

December 2019 - March 2021

Project:

  • Cellular Cofferdam Construction for a Temporary Beach Landing at Afungi, Mozambique

Techniques used:

  • Vibratory driven piling of in total 16 pieces cellular cells
  • Installation of over 1400 pcs of AS500-12 sheet piles
  • Cellular guiding frame based on diameter 14,1 m

Features:

  • Offshore operations of Marine installation project at the Coast of Mozambique
  • In-house engineering and designed hydraulic adjustable Cellular guiding frame
view project
see all projects Cofferdam Denmark

Denmark

Installing (Part 1) : February - April 2021

Removal (Part 2) : May - June 2021

Project:

  • Supply, construction and removal of complete cofferdam with embossing and anchoring for the purpose of installation of a pipeline

Techniques used:

  • Vibratory driven piling of a double Cofferdam
  • Partly onshore and partly offshore trench
  • Length sheet piles varying form 9 to 20 meters

Features:

  • All operations carried from causeways constructed at the same time as the sheet pile installation

Teams consisting of piling workers, operators and welders, along with all the necessary equipment for the construction of the sheet piles are in Denmark for this project.

view project
see all projects Poti Port, Georgia

Rehabilitation Poti Port

Poti, Georgia

July 2020 - July 2021

Client: Prime Concrete LLC

Project: 

  • Supply and installation of Steel sheet piles for the rehabilitation of approximately 300 metres along the existing quay, a dolphin and two piers at Poti Port. The dolphin and piers are constructed as cellular constructions.

Techniques used:

  • Vibratory driven piling of flat and AZ sheet piles  

Features: 

  • For this project we engineered and designed a modular guiding frame, based on seperate moving platforms

Two staff members of Vanthek Projects travelled to Georgia along with materials and equipment for the construction of the quay, dolphin and piers.

view project
see all projects Realisation new quay walls

Matthew Town & GunPoint, Bahamas

February - July 2017 (two projects, three locations)

Client: Van Oord Dredging and marine Contractors BV

Project:

  • Installing new quay walls for two different ports.
  • In order to support the structure, multiple tubular shaped piles have been installed.

Techniques used:

  • Gun Point: installation 1.831 m2 sheet piles
  • Matthew Town - Northern quay: installation 1.631 m2 sheet piles
  • Matthew Town - Northern quay: installation 10 pieces ∅ 1.020 x 14 mm1 Tube piles
  • Matthew Town - Southern quay: installation 1.762 m2 sheet piles

Features:

  • Rocky and diversity of soil types
  • Preserve nature and installation of newly formed coral

Two Vanthek Projects staff members were on location for the duration of the project. Due to the special location and limited accessibility of this project, Vanthek worked closely with the teams present from the client.

view project
see all projects Nassau Cruise Terminal

Nassau, Bahamas

November 2020 -Ongoing

Client: ENKA Construction and Development BV

Project: 

  • Installation of steel tubular piles and sheet piles for the construction of the Nassau Cruise Port Terminal
view project
see all projects Implementing travel lift construction

Coral Harbour Nassau, Bahamas 

August - November 2017

Client: Van Oord Dredging and marine Contractors BV

Project:

  • Designing and calculating temporary scaffolding and capacity of temporary piles.
  • Realisation of foundation for a 150-tonne travel lift.

Techniques used:

  • Piling of precast concrete piles (40 pieces, 45 x 45 cm, 14 m' length)
  • Installation and removal of steel tubular piles and beams (temporary scaffolding)

Two staff members of Vanthek Projects were on location for the duration of the project.

view project
see all projects Burullus Cofferdam

Burullus, Egypt

Installing (Part 1): February - July 2017

Removal (Part 2): March 2018

Client: Dredging International

Project:

  • Supply, construction and removal of complete cofferdam with embossing and anchoring for the purpose of installation HDPE pipelines.

Techniques used:

  • Vibratory driven piling of a total of 460 stretching metres of sheet piles (2*170+ 2*50+ 2*10)
  • 50 metre trench onshore, 120 metre trench offshore
  • Length sheet piles varÿing from 10 to 26 metres

Features:

  • Anchoring of the head curtain by way of an anchor or an anchor panel
  • All operations carried from a causeway constructed at the same time as the sheet pile

Three members of staff, along with all the necessary equipment for the construction of the sheet pile travelled to Egypt for this project.

view project
see all projects BMF Port

Burgas,  Bulgaria

July - December 2017

Client: BMF Ports Burgas EAD

Project: 

  • Supply and installation of steel tubular piles for OGV dolphins for ships and MCV jetty at Port Burgas, Bulgaria. 

Techniques used:

  • Vibratory driven piling of in total 134 steel tubular piles
  • Tubular piles with a diameter of 813 mm
  • Length tubular piles varies from 24.5 to 26 metre

Features: 

  • All operations carried out from barge with limited workspace at Port Burgas, with connection to the open sea. 
  • The majority of the steel tubular piles were to be constructed in suspension (6:1, 8:1).

Two staff members of Vanthek Projects travelled to Bulgaria, along with materials and equipment, for the construction of the OGV dolphins and MCV jetty.

view project
see all projects Cofferdam Nigeria

Idoho, Nigeria

Installing (Part 1): December 2017 - March 2018

Removal (Part 2): May -  July 2018

Client: Van Oord Dredging and Marine Contractors BV

Project:

  • Supply, construction and removal of complete cofferdam with embossing and anchoring for the purpose of installation HDPE pipelines.

Techniques used:

  • Vibratory driven piling of a double Cofferdam of 175 stretching meters 
  • 50 meter trench onshore, 120 meter trench offshore
  • Length sheet piles varying from 14 to 20 meters

Features:

  • All operations carried from causeways constructed at the same time as the sheet pile installation

Two teams consisting of piling workers, operators, mechanics and welders, along with all the necessary equipment for the construction of the sheet pile travelled to Nigeria for this project.

view project
see all projects Port Area Road Development

Mombasa, Kenya

Project in collaboration with Alphahek

September 2020 - Ongoing

Project:

  • Offshore and onshore Steel piling works at Mwache Bridge & Mteza Bridge at Mombasa, Kenya

Techniques used:

  • Vibratory driven piling of in total 650 steel tubular piles
  • Static load tests (SLT)
  • Tubular piles with a diameter of 600 and 1500 mm
  • Length tubular piles varies upto 41.5 meter

Features:

  • Operations carried out from land (onshore) and barge (offshore) at Mombasa, Kenya.

Staff member of Vanthek Projects provided supervision and training during the construction of the steel piling works.

 

view project
our Facebook feed
Our LinkedIn Feed

call or mail for a quotation

+31 (0) 299 - 313057 request