Burgas, Bulgaria
July - December 2017
Client: BMF Ports Burgas EAD
Project:
- Supply and installation of steel tubular piles for OGV dolphins for ships and MCV jetty at Port Burgas, Bulgaria.
Techniques used:
- Vibratory driven piling of in total 134 steel tubular piles
- Tubular piles with a diameter of 813 mm
- Length tubular piles varies from 24.5 to 26 metre
Features:
- All operations carried out from barge with limited workspace at Port Burgas, with connection to the open sea.
- The majority of the steel tubular piles were to be constructed in suspension (6:1, 8:1).
Two staff members of Vanthek Projects travelled to Bulgaria, along with materials and equipment, for the construction of the OGV dolphins and MCV jetty.