Rehabilitation Poti Port
Poti, Georgia
July 2020 - July 2021
Client: Prime Concrete LLC
Project:
- Supply and installation of Steel sheet piles for the rehabilitation of approximately 300 metres along the existing quay, a dolphin and two piers at Poti Port. The dolphin and piers are constructed as cellular constructions.
Techniques used:
- Vibratory driven piling of flat and AZ sheet piles
Features:
- For this project we engineered and designed a modular guiding frame, based on seperate moving platforms
Two staff members of Vanthek Projects travelled to Georgia along with materials and equipment for the construction of the quay, dolphin and piers.